We didn’t have to improve load lift capacity by up to 22%. And we didn’t have to increase the backhoe’s digging depth by 30%. But we did. And now, after more than a 1000 hours of testing from the scorching heat of Texas to the frigid air of Michigan, the new 2024 MT2E models are here.